Construction Progress 2013

Work on the parking lot resumed in May and continued through mid-July.  Below are a few photos of how things looked at the end of that time.  Next on the agenda will be edging some of the the landscaped areas with cobblestones, and surfacing the driveway with bluestone hard pack.  (Return to Facilities Expansion page)

Landscape areas outside front door

Landscape areas outside front door

Forms for pouring concrete to extend the ramp

Forms for pouring concrete to extend the ramp

Walkway to the food pantry entrance

Walkway to the food pantry entrance

Pole light and sidewalk from the north lot

Pole light and sidewalk from the north lot

Fire lane behind the building connects to the new north lot

Fire lane behind the building connects to the new north lot 

A system of yard drains and catch basins will alleviate some perennial erosion issues.

A system of yard drains and catch basins will alleviate some perennial erosion issues.

Extending the ramp to the relocated handicap parking spaces

Extending the ramp to the relocated handicap parking spaces

(Return to Facilities Expansion page)